Because of the experience and knowledge of RFS with stainless steel pipe work we had the job to pipe up an anaerobic digestion plant.  Stainless steel purged pipework was installed with 44 gas take off points using our own manufacturing tee pulling process.  With the nature of the layout, this AD plant the with “off the shelf” fittings were just not suitable, so a hygienic swept 6 inch Y piece was made to allow equal flow in either direction.